Meanwhile the defective state of drainage of the great level of the fens
still continued, and everybody was convinced that the only remedy was to
carry into effect the Eau Brink Cut as awarded by Captain Huddart. It was
therefore resolved that a new Act of Parliament should be obtained for
this purpose, increasing the tax upon the lands proposed to be benefited
sufficiently to cover the costs according to the estimate of my father,
who was appointed engineer-in-chief of the drainage interests; and the
above-mentioned gentlemen, Lord W. Bentinck, Sir A. Hammond, Sir Charles
Browne, and Thomas Hoseason, Esq., were appointed as the executive
committee.
 
The Act having passed, Messrs. Jolliffe and Banks tendered for, and
received and executed the contract.
 
The effect of this work greatly exceeded the most sanguine expectations
of its supporters. Immediately after it was opened the low-water mark at
the upper end of the cut fell five feet, and the drainage waters were
carried off with a degree of rapidity which astonished the whole country.
The autumn and winter of 1821-2 was characterized by an unusual quantity
of rainfall, and if it had not been for the opening of the Eau Brink
Cut the whole, or the greater part, of the level of the fens would have
been under water, and therefore the fenmen were very well pleased with
the result. At this time I was appointed to succeed my father as chief
drainage engineer, and the late Mr. Telford had been previously appointed
the chief engineer for navigation. Immediately after my appointment,
which was in the month of December, 1821, I went to Lynn to examine the
works, and was much astonished to find the great effects which had been
produced by the Eau Brink Cut. Instead of the circuitous old shallow
course, full of shoals and obstructions of every kind, there was a fine
straight, deep channel, two miles shorter than the old one, of the proper
width, bordered by strong banks of the full height; the floods passed off
without difficulty, and the navigation was so much improved that the
lighters and barges going up the river from Lynn saved several tides.
It is true that upon examining the country between Denver Sluice and
Cambridge, there was a great deal of water out in several places, but
this was attributed to the interior drains and rivers not being properly
defended and embanked, so that they could carry off the water to the main
outfall below. I also examined the new steam pumping apparatus, which had
lately been erected for draining Soham and other fens. This, although
proposed by my father in 1786, was the first of the kind that had been
erected. It consisted of a scoop wheel, with a perpendicular lift, worked
by a condensing engine. It answered its object completely, and has since
been imitated by numerous others with equal success in different parts
of the fen and lowland districts. Yet in many places it has been found
very difficult to induce the fen proprietors to combine together in order
to effect a natural drainage, which would be better and less expensive;
they prefer to act independently of each other, and adopt the steam
wheel. Still, even with this, the main outfalls must be improved to their
fullest extent, otherwise the water cannot run off; and when the floods
in the adjacent rivers rise so high that the banks are endangered, the
pumping must be discontinued, otherwise the banks will break, and then a
greater injury will ensue. Nevertheless, the steam pumping apparatus is
an immense improvement on the old windmill, which could only work when
there was wind.
 
My next appointment was to succeed my father as engineer-in-chief to
Ramsgate Harbour.
 
This harbour was established by special Act of Parliament for the purpose
of affording shelter to vessels of 300 tons lying in the Downs during
south-west gales. When these winds prevail that anchorage is crowded with
all classes of vessels, and the smaller ones, not being so well found
with ground tackle as the larger, are liable to be driven from their
moorings and fall foul of the larger vessels, causing them to go adrift
also, and thus creating considerable confusion and damage; but by having
Ramsgate under their lee, the small vessels can always get under way,
run for it at the commencement of the flood, and reach it in safety long
before high water, at which time the Goodwin Sands are covered, and a
heavy sea rolls into the Downs. In fact, Ramsgate Harbour was made for
clearing the Downs of small vessels, so that the large ones may ride in
safety, and so far has effectually answered its object.
 
There were a certain number of trustees appointed under the Act, who
were selected from the principal merchants and shipowners of London,
and the Deputy Master and three or four Elder Brethren of the Trinity
were members of the Board of Trustees _ex officio_. At the time I was
appointed engineer, the celebrated Sir William Curtis, Bart., member for
the City of London, was chairman, and the worthy Deputy Master of the
Trinity House, Sir John Woolmore, represented that Corporation with three
others of the Elder Brethren. As this was one of the oldest and most
important harbour trusts in the kingdom, I felt great honour in being
appointed their chief engineer, the more so as the celebrated Smeaton and
my father had previously occupied that position. It was here that Smeaton
followed out the idea that had been originally proposed at Dundee, of
establishing an inner basin with sluices for the purpose of scouring
away the mud which continually accumulated in the outer harbour, owing
to the great quantity of alluvial matter brought in from the adjacent
coast and waters, which otherwise in a very short time would have filled
it up and rendered it useless. Ramsgate Harbour was also celebrated for
being the first place of the kind where the diving bell was introduced by
Smeaton for the purpose of laying down moorings and removing obstacles
under water. The diving bell was afterwards, in 1813, much improved,
and rendered, for the first time, applicable to building masonry under
water with as much security and accuracy as building upon dry land. In
such an exposed situation it was more economical and expeditious than
the old cofferdams; it was in this manner Mr. Rennie rebuilt the east
pier-head in 17 feet at low-water spring tides, which was originally made
by Smeaton, and which failed. I also succeeded my father at Sunderland,
Donaghadee, Port Patrick, and Kingstown harbours, the West India Docks,
besides other places soon afterwards, so that I had a large business, and
was daily getting more.
 
The most difficult and anxious work, however, at that time was the
new dockyard at Sheerness, designed and partly carried into effect by
my father. He originally, in the year 1807, recommended that the old
dockyard, which was composed only of some old wooden slips imbedded in
the mud, a few storehouses, a wretched basin, lined with wooden walls,
and some timber jetties, should be abolished. He said that it was on the
lee or wrong side of the harbour, that the foundation for new works was
of mud and quicksand, that the space, on account of the buildings in the
old town, was very confined, and, therefore, that to make a good dockyard
there would be very expensive, and he thought it would be far better to
make a new complete establishment at Northfleet, just above Gravesend,
and to get rid of Woolwich, Deptford, and Sheerness altogether. Mr. Pitt,
then Prime Minister, decided that it should be done; but when he died the
matter fell to the ground, as I have before said, although the land was
bought for the purpose.
 
However, after the great war had terminated, in 1815, the nation was
naturally anxious to reduce the expenditure as much as possible, so that
the House of Commons would not listen to the idea of expending any large
sums upon great new works either for the navy or the army; and it was
only after considerable difficulty that the House of Commons would grant
money for the repairs of Sheerness Dockyard, and, like most extensive
repairs, it was found, when too late, that it would have been far better
to have abandoned Sheerness altogether.
 
Nevertheless it was absolutely necessary to do something to the Thames
and Medway dockyards, to keep in repair the large fleet of vessels which
was there laid up in ordinary. The total number of pennants flying at the
close of the war was about 1000, and the last vote for seamen in 1815
included 127,000 sailors and marines. As there was greater depth of water
at Sheerness than at any of the dockyards, and as the harbour immediately
contiguous was capable of accommodating with ease any number of large
vessels, Sheerness was decided upon as the place where the greatest
repairs and improvements should be made, and it ended in an entirely new
dockyard being built. The works accordingly commenced in 1815, and the
late Lord Melville laid the first stone at the north end that year. It
ended in expending nearly 3,000,000_l._, 1,700,000_l._ of which went to
the engineering department, and the remainder in the purchase of ground,
buildings in the town of Sheerness, in storehouses, mast and timber
ponds, smithery, admiral’s and officers’ houses. The engineering works
were of the most difficult kind; the foundations were composed of nothing
but soft mud and loose quicksands to an almost interminable depth, so
that my father was obliged to invent an entirely new system of hollow
walls faced with granite in front and brick behind. This system of walls,
which was entirely new, by giving a greater superficial area of bearing
surface with the same weight of materials, rendered them thoroughly
secure. He had adopted this kind of construction with perfect success at
the docks at Great Grimsby, in Lincolnshire, and they succeeded equally
well at Sheerness, although exposed to much greater difficulties. The
dockyard as completed consists of one basin of nearly 3 acres, at the
east end of which are three docks for first-rate vessels of war, with a
depth of 9 feet at low water of spring tides, the basin being of the same
depth, so that with a rise of tide of 18 feet at spring tides the largest
vessels can always be docked at those times. There is also another tidal
basin of about the same size, together with large storehouses, smithery,
mast ponds, boathouses, admiral’s and officers’ houses, chapel, &c., and
ample space for timber and other materials. This dockyard, therefore, as
was the intention, is well adapted for keeping in repair the numerous
vessels lying up in ordinary in the adjacent harbour, or for executing
any repairs which vessels on the northern stations may require; it never
was intended to be a building yard, and it answers its original purpose
well. It should be mentioned, that here Mr. Rennie first introduced
cast-iron gates for the dry docks; these fitted to the granite quoins so
nicely by polishing the two surfaces, iron and stone, with emery, that
they worked together perfectly, and were completely water-tight; and
although they have now been in use forty-five years, they are as good as
on the day when they were made.
 
At the time that these works were proceeding, it was decided to make a
new large granite dry dock at Chatham, similar to those at Sheerness; and
some improvements in the line of river wall, which partly interfered with
the free circulation of the tide there, were being constructed when I was
appointed, and I finished them.
 
The breakwater in Plymouth Sound, which was designed by my father and
commenced in 1815, had made considerable progress; in fact, the great
mass of rubble stone had been deposited throughout its entire length,
so that vessels of war as well as merchantmen could safely lie under
its protection during the heaviest gales from the westward. When I was
appointed engineer to the Admiralty, the late excellent Mr. Joseph