Autobiography of Sir John Rennie, F.R.S. 31
At that time a former Act rendered it necessary that before any
improvement was made in any port or harbour, a Commission should be
appointed by the Admiralty to investigate the plan, the Commission to
hold its inquiry in public; Captain Washington and Captain Veitch were
appointed by the Admiralty for this purpose. They held their court at
the townhall, Lynn, and, singular to relate, the gallant gentlemen
advocated a curved instead of a straight channel, which, under the
circumstances, was so contrary to the practice of every good hydraulic
engineer, that their report was simply ridiculous, and when produced
by the Admiralty before the Committee of the House of Commons on the
Bill, was proved by the best engineers to be wrong, and was therefore
ignored by the Committee, and the plan proposed by Mr. Stephenson and
myself was unanimously adopted. The Bill accordingly passed, and the
agreement between the Middle Level Commissioners, the Corporation of
Lynn, and the Company, the two former contributing 60,000_l._ each, was
ratified; still there were several restrictive clauses, such as entailing
the maintenance of the works upon the Company, giving up the whole of
the green marsh to the several frontages, which materially abridged
the profits of the Company, and increased their risks, and which I in
vain protested against. The main cut commenced on the lower side of
Lynn, and was continued in a straight line 2½ miles. We calculated that
certain dimensions were ample in the first instance, because it was not
necessary to excavate the cut artificially to the full depth, as we knew
that as soon as the current began to act upon it, it would in a short
time be adjusted to its proper capacity for the admission and discharge
of the tidal waters, in the same manner as had taken place in the Nene
estuary outfall already mentioned. From the lower end of the above cut
the channel for a distance of two miles farther to deep water was to be
trained through the sands, formed by guide walls of rough stone raised to
about the level of half tide, with beacons upon it at certain distances
to indicate the channel; and when once the channel had been thus trained,
the remainder of the banks to their full height above high water would
be raised naturally by the silting up on each side, combined with the
gradual process of embanking the land from each of the shores of the
estuary, if properly managed.
Messrs. Peto undertook the contract of the main cut. The land having
been bought, and everything arranged, a day was fixed for turning the
first sod, at the upper end near Lynn. The ceremony was performed by the
late worthy Sir William Foulkes, the chairman of the Company, on the 1st
of November, 1850. On that day a grand procession, consisting of the
Company, the Corporation and trades of Lynn, the Earl of Leicester, Lord
Lieutenant, together with numerous gentry, and other spectators, attended
the ceremony, which went off with great _éclat_, and the whole, as usual,
terminated with a grand dinner to about two hundred persons at the
townhall. Unfortunately my friend Mr. Stephenson was abroad and could not
attend. The excavation of the great cut proceeded rapidly for some time,
until Mr. Stephenson and myself, judging that enough had been done, and
that the current would do the rest more effectually, ordered the dams
to be removed at both ends and the water admitted, which was accordingly
done. As soon as the fen proprietors heard of this, they were greatly
alarmed; they said that the Company had violated their agreement with
them, and had gone contrary to the Act of Parliament, in not excavating
the cut to the full depth required before letting the water in. We
endeavoured in vain to persuade them to the contrary. They immediately
applied for a mandamus to stop the works and restore the dams until the
cut had been excavated to the full dimensions required by the Act, and
obtained an injunction, so that we were compelled to restore the dams and
stop out the water. We determined, however, not to give up the point,
and argued the question before Vice-Chancellor Turner, and were beaten.
We then applied to the Admiralty, who would not assist. We appealed from
the Vice-Chancellor’s decision to the Lords Justices of Appeal, and were
again beaten; still we would not give up, and at last we found that there
was no alternative but to get a new Act of Parliament allowing us to
make the cut in any manner we pleased, provided that we made it of the
dimensions originally agreed upon. The Eau Brink Commissioners opposed us
by every means in their power, but our evidence, which was given by the
first engineers of the day, so completely satisfied Parliament that we
carried our new Bill as we wished it.
Thus, after a severe struggle for two years, we carried our point; but
this was so much valuable time lost, besides a great deal of money spent
in litigation. Having obtained our new Act, we set to work immediately
to remove the dams of the cut, and to let the water in, and at the same
time to commence the dam for stopping up the old channel of the Ouse at
the lower end of the town of Lynn, near the upper end of the new cut.
As the dams and bottom of the river near them were composed of strong
clay, it took some time to remove them so as to admit the waters freely
into the cut; but as soon as this was done, the scour began to have a
sensible effect; this was increased by the closing of the dam across the
old channel, so that within a few months afterwards not only had the
new cut been scoured out to the full depth required by the old Act, but
considerably beyond it. Thus Stephenson and myself were proved in the
right, and the opposition entirely in the wrong.
The effect on the port of Lynn was very remarkable. The depth of water
at spring tides was 18 to 20 feet, and neaps 14 to 16 feet; and there
was a regular depth at low water of spring tides of 9 to 12 feet in
the cut, so that the largest vessels could always come up and depart
with their full cargoes either at spring or neap tides, and the channel
was so direct and easy of navigation, that pilots, of whom there was a
large establishment, became in a great measure unnecessary, and their
numbers were considerably reduced as well as their charges, and the
increase of trade soon enabled the town of Lynn to pay off the 60,000_l._
contribution to the estuary works.
The drainage interests also derived a similar benefit by the lowering of
the low-water mark 6 feet, which, together with that obtained by the Eau
Brink Cut, was altogether 11 feet. The Middle Level Drainage, upon which
a large sum had been expended, obtained an increased fall of between 3
and 4 feet, which enabled the Commissioners to drain the greatest portion
of their lands naturally instead of artificially. In fact, the Port of
Lynn by means of these works has become one of the best on the east
coast of England, at the least expense, and with the most moderate dues;
indeed, if the Drainage and Navigation had paid double the money which
they did to this great work, and which in justice they ought to have done
for the benefits it has conferred upon them, they would have been more
than amply indemnified.
The Estuary Company having now completed the cut, turned their attention
to the best means of reclaiming from the Wash the 35,000 acres which had
been allotted to them by the Crown, or at least as much of it as they
could; but unfortunately there were so many different opinions among them
and their advisers, that they lost a great deal of time and money in
pursuing improper measures. I, who originally designed the undertaking,
and had acquired great experience in this department from having carried
on successfully similar works in the Great Wash and elsewhere, always
adhered to one system, namely, to work with nature, and never to go
against her; if we did, I invariably found that we were beaten.
We knew, from a variety of experiments that had been made, that the
alluvial matter held in suspension by the waters in the Great Wash was an
ascertainable quantity; that this alluvial matter was transferred from
one place to another, according to the prevailing winds and currents;
and that it was only deposited where circumstances were favourable, such
as eddies and sheltered stagnant places. Now my great object (after
having confined the fresh and tidal waters of the river Ouse to one
adequate channel, so as to preserve the drainage and navigation in an
efficient state) was to cause to be deposited the alluvial matter that
was held in suspension in the waters spreading over the other parts
of the estuary. This could only be done effectually by arresting the
progress of the flowing and ebbing waters in such a manner, that as much
of the alluvial matter as possible might be deposited in the places most
convenient, that is, in those places where it was desired to raise the
soil above the level of high water of neap tides. When this level is
reached grass may be expected to grow, and in a very short time the
whole is converted into a green marsh. The process simply this: when the
deposit has reached a certain number of feet above low water of spring
tides, a species of light green vegetation first covers the surface in
patches, then by degrees extends over the whole; the reclaimed land
still continues rising, and at a higher level above low water samphire
makes its appearance; the accumulation of soil still goes on increasing,
when the samphire disappears, and grass succeeds it, and in a short time
afterwards the place assumes the appearance of a level green marsh well
adapted for grazing cattle. After it has arrived at this stage, which it
does at about the level of high water of neap tides, the accumulation
is very slow; on our coasts it seldom attains a much higher elevation,
except where the sand is blown up by strong winds from the sea, which
forms dunes or banks, that, as in the case of Holland and other places,
sometimes attain an elevation of 30 feet and upwards above the level of
the highest tides. This, however, is not the case around the shores of
the Great Wash; there the marshes are simply produced by the gradual
deposit of alluvial matter in the manner above stated.
The great object, therefore, as I have said, is to facilitate this
deposit or accretion as much as possible by artificial means. Nature,
if left to herself, though sure, is very slow. We must therefore assist
nature, by following and working in unison with her laws. We must go
to work gradually, and not by great and expensive operations check the
currents violently and at once, which would only produce an equally
strong current elsewhere, so that while we gained in one place we should
lose in another. By a series of light works composed of bushy fagots or
other similar materials, raised about 12 or 15 inches above the level
of the sands, and disposed in a series of lines at certain distances
from each other, not continuous, but in lengths, so that the ends may
overlap each other, the currents will be gently checked without being
wholly obstructed, the water between them will be rendered stagnant, and
the alluvial matter with which it is charged will be deposited. When
the deposit has reached to the top of these works, the works themselves
should be raised higher in the same place, or in an intermediate
position, as circumstances shall render advisable. Where a certain space
is intended to be raised or warped up, it is generally better to commence
at the upper end and work downwards; the works themselves are less
expensive, the height to be raised is less, and the water impelled by the
mass of the tide behind brings up a greater quantity of alluvial matter,
and in proportion as the space above is warped up it accumulates in a
greater degree below. In carrying on works of this kind, wherever we find
that there is a tendency to make a channel, and with it a strong current,
it must be checked gradually from the upper end, so that the quantity of
water passing through it may be decreased, and this channel will soon
fill up. When a certain space has been naturally or artificially raised