2017년 3월 17일 금요일

Autobiography of Sir John Rennie, F.R.S. 6

Autobiography of Sir John Rennie, F.R.S. 6


the platform, upon which the ribs of the centre had been constructed, and
were lying ready to be transferred to their places. Each rib was then
raised by means of powerful sheer-poles, to which were double-purchase
crabs, treble blocks, with all the necessary ropes, chains, and other
tackle, by which means each rib of the centre was readily raised from
the platform where it was built and transferred to its proper stage in
the floating barge, and there secured in an upright position, when the
ribs had been fixed in their places. The barge was then floated into the
opening where the arch was to be constructed, which was generally done
about half an hour before high water, so as to allow ample time to adjust
and fix the ribs over the corresponding pair of wedges and trestles upon
which it was ultimately to rest, which was done as the tide fell, and
adjusted to the greatest nicety by the screws before mentioned; when the
rib had been fixed in its place, the barge returned to bring another,
which was served in the same manner as the first, and thus the fixing of
one centre occupied only six days. This system answered most effectually,
and was subsequently adopted by Mr. Robert Stephenson for fixing the
great tubes for the Menai and Conway bridges.
 
The Waterloo Bridge, as well known, consists of nine equal
semi-elliptical arches, 120 feet span each, with a rise of 34 feet 6
inches, the keystones at the crown being 4 feet 6 inches deep and 10
feet at the spring, and 18 inches thick at the soffit; inverted arches
on each pier between the main arches 4 feet 6 inches deep. The piers
were 20 feet wide, each having projecting buttresses, supported by two
three-quarter Doric columnar pilasters, over each pier, the whole being
surmounted by a Doric block cornice and balustrade parapet, level from
end to end, the same as the roadway. The roadway above the piers was
supported by six brick walls, 2 ft. 3 in. thick, covered with corbel
stones. The shores being low on both sides of the river, the approaches
are constructed so as to form an inclined plane rising 1 in 30 on the
Surrey side, and nearly level on the north, or Middlesex side, with the
Strand, upon a series of brick arches 16 feet wide each. These arches
serve for storehouses. The roadway was formed by a layer of well-puddled
clay 15 inches thick, then a layer of lime and of fine gravel 3 inches
thick, then a layer of equally broken granite, in pieces 2 inches in
diameter, 1 foot thick. Through the centre of the masonry of each pier
a hole 18 inches in diameter was cut, entering the river on one side of
the pier at low water, and from the top of this hole inside the pier
cast-iron branch pipes of the same diameter were carried to side drains
on each side of the roadway, so that all rain and surface water was
effectually carried off into the river, thus preventing leakage.
 
The piers and abutments were founded in the solid bed of the river, which
is strong gravel; they rest upon a wooden platform, supported upon piles
12 inches in diameter driven 20 feet into the bed of the river. The
whole of the arches and exterior face of the bridge are built of Cornish
granite, from the vicinity of Penryn, and the balustrade is made of fine
grey Aberdeen granite.
 
The contract for the Cornish granite was taken by a very worthy man of
the name of Gray, and the price was such as on so large a quantity ought
to have enabled him to realize a very handsome profit; but he had no
system or machinery adequate for the purpose, and instead of opening
quarries properly upon an enlarged scale in the solid rock, by which he
would have saved a great deal, he chiefly confined his operations to the
loose outlying blocks, which reduced his profits considerably, and in
the end it is very doubtful whether he did more than cover his expenses.
As the dressing of granite for masonry was entirely new at that time,
nothing having been built of this material in London, it was extremely
difficult to find masons who would undertake it, even at such enormous
prices as 1_s._ 9_d._ to 2_s._ per cube foot, so that the contractors,
Messrs. Jolliffe and Banks, could not afford to pay it. Workmen were
therefore obtained from Aberdeen, and the price was ultimately reduced
from 2_s._ to 1_s._; notwithstanding, however, the prime cost of the
stone, the freight, dressing, mortar, and setting complete in the bridge
cost about 7_s._ 2_d._ to 7_s._ 3_d._, so that the total cost was near
7_s._ 6_d._ It should be observed, however, that at that time there was
a duty of threepence per cubic foot (or ton?) on stone, which has since
been taken off. The interior stone consisted of hard sandstone from
Derbyshire and Yorkshire.
 
The bridge and approaches were completed and opened with great ceremony
by George IV., then Prince Regent, on the 15th of June, 1817, in
commemoration of the battle of Waterloo, after which it was especially
named. Twenty-five pieces of artillery were placed on the centre of
the bridge, which fired a salute as His Royal Highness, the directors
of the Company, and a brilliant suite walked over in procession, when
he christened it Waterloo Bridge, and declared it open to the public.
His Royal Highness came by water in his state barge, accompanied by the
Admiralty and other barges, in which were the ministers and suite; he
landed at the stairs on the south-east side of the bridge, and walked
over it from south to north; he embarked again on the north-east
side, and returned to Whitehall and Carlton House. The sight was very
brilliant, the weather magnificent, and everybody seemed to be satisfied.
 
The total cost of the bridge was 565,000_l._, which was 10,000_l._ more
than estimated by Mr. Rennie; the approaches, besides the land and
buildings, cost a further sum of 112,000_l._; so that the total cost of
the bridge and approaches was 677,000_l._, and the land and buildings
and contingencies 373,000_l._, making a total of 1,050,000_l._ This is
certainly a very large sum for a bridge and its approaches; but when its
extent is considered, the bridge alone being a quarter of a mile long,
and the approaches nearly three-quarters of a mile more, also the great
cost of materials and labour of every kind, the stone-cutting costing
from 4_s._ to 6_s._ a cubic foot in the rough state, timber from 7_l._ to
14_l._ per load, and labour in the same proportion (which is more than
double the present price), we cannot be surprised at the total cost.
 
I still continued my duties at the Southwark Bridge, which was completed
in March, 1819, and was opened without any ceremony by Sir John Jackson,
the chairman of the Company, and the other directors.
 
 
 
 
CHAPTER II.
 
Travels in Switzerland, Italy, Greece, Asia Minor,
Constantinople, and Egypt--Return to England--Death of Mr.
Rennie.
 
 
I had now received a tolerably good education, both theoretical and
practical, as a civil engineer; but before entering fully into practice
on my own account, my father thought it advisable that I should travel
for a time to study what had been done in ancient and modern times both
in architecture and engineering. I accordingly left England on the 7th
of June, 1819, in company with my cousin, Colonel, now General, Sir J.
Aitchison, and the late Lord Hotham, his friend. We had a thirty-three
hours’ passage from Brighton to Dieppe, during which time, having
exhausted the captain’s store of bread and cheese, not very abundant, we
were glad to fall back on a dozen mackerel, which Lord Hotham’s servant
was fortunate enough to catch. We passed through France without much
incident; but when the view from the summit of the Jura suddenly burst
upon us, the magnificent scene made a most lasting impression upon my
memory. The valley of the Rhone, the Lake of Geneva, backed by Mont Blanc
and its splendid range of mountains, rose before us as if by magic; we
were totally unprepared for it, could scarcely believe our senses, and
stood enraptured for nearly half an hour. We then descended to Geneva,
where we passed several days very agreeably, examining what was then the
picturesque old town, with its clumsy, old-fashioned waterworks; for the
improvement of these my father, through the well-known Dr. Marcet, had
just made a design for the municipality, which was much approved of, and
which I understand has since been partially carried into effect. I here
made the acquaintance of General Dufour, so well known for his scientific
acquirements, and after a few days went on an expedition to Chamounix,
where, as no one then thought of ascending Mont Blanc, we climbed the
Montanvert and the Mer de Glace, where I made some experiments with
Leslie’s hygrometer. Having returned to Geneva, we started again on
the 7th July for a more extended tour in the mountains, going by the
lakes of Morat and Bienne, the scene of the great battle of 1476. I
examined these two lakes, which were evidently rapidly filling up, but
by lowering the outfalls a great part of the whole might be recovered,
whereas at present the borders are to a great extent covered with reeds,
and the marshes exhale unwholesome effluvia. After passing through
Freibourg, where the bridge, then newly opened, was considered one of
the wonders of Switzerland, and which, as a most remarkable work of its
kind, I examined attentively, we passed on to Berne, and going through
the mountains, returned to Geneva. On our way, being at Meyringen, and
short of ready cash, we proposed either to return direct to Geneva, or
to change one of Herries’ circular notes; but on offering one of these
notes to the landlord, he at once said there was no occasion for it, as
we were Englishmen, and that was enough. Having produced a large bag of
five-franc pieces, he told us to help ourselves, and was with difficulty
persuaded to take one of Herries’ notes in exchange. I merely mention
this to show how high the name of Englishmen then stood on the Continent.
 
Leaving Geneva for Italy, we proceeded by the route of the Simplon, the
construction of which I had promised to observe very attentively for my
father. The first portion only presents, as objects of interest, the
excavations through the rock of St. Gingough, near the upper end of the
lake. From Martigny we started up the valley of the Rhone, where, though
the ground is generally level, the road yet encounters considerable
difficulties from the river, which here assumes the character of a
torrent, and when swollen by floods sweeps almost everything before it;
wandering from side to side it deposits the _débris_ of the one side
on the banks of the other, forming, we may say, alternately rapids and
almost still pools, which renders it extremely difficult to confine its
course within any reasonable limits; so that the art of the engineer
is taxed to the uttermost. I thought that in many places the works
were not designed with that solidity which is so necessary under such
circumstances, and that sufficient precautions were not taken to arrest
the progress of the _débris_. I considered that by providing depositories
for it at certain favourable stations, the violence of the floods might
have been considerably controlled, a much greater extent of land on
both sides of the river rendered available for cultivation, and the
extensive marshes, which, operated upon by a powerful sun, now produce
most injurious exhalations, might have been deprived of their baneful influence.

댓글 없음: